Built in December 2016, Finley High School COLA was built as a large cover over the concrete area between school buildings. Features included Galvanized steel with no welding on-site, and bird-proofing to protect children from bird droppings.
Built with solid structure and roof, this outdoor cover will protect children from UV rays and stormy weather, allowing further access to outside educational areas in all weather conditions.

