Logo
Post Title
Finley High School Covered Outdoor Learning Area
Posted Time
07/03/2017
Author
Rodney Doven
Advertiser
Rodney Doven

About this post

Post Description:

Built in December 2016, Finley High School COLA was built as a large cover over the concrete area between school buildings. Features included Galvanized steel with no welding on-site, and bird-proofing to protect children from bird droppings.

Built with solid structure and roof, this outdoor cover will protect children from UV rays and stormy weather, allowing further access to outside educational areas in all weather conditions.