Burdekin to Moranbah Pipeline, Queensland: 218 km

Burdekin to Moranbah Pipeline, Queensland: 218 km


 

Drought does not only affect farms and towns. In central Queensland it began to threaten mining operations around Moranbah, and the Queensland Government responded with a major water transfer. The Burdekin to Moranbah pipeline moves water 218 km from Burdekin Falls Dam to Moranbah, west of Mackay, in a $270 million project delivered for SunWater. Viadux supplied 46 km of TYTON DN750 ductile iron pipe, and the pipeline was commissioned in August 2007. It ensured a continued water supply for the mining industry and the local economy.

Project at a glance

• Client: SunWater

• Location: West of Mackay, Queensland

• Scope: 218 km pipeline from Burdekin Falls Dam to Moranbah

• Project value: $270 million

• Viadux supply: 46 km of TYTON DN750 ductile iron pipe

• Other products listed on the project: 8130D MSCL pipe, SUREFLOW valves and fittings

• Commissioned: August 2007


Table of Contents

• The Problem: Drought Reaching the Mines

• Building the Burdekin to Moranbah Pipeline

• The Pipeline in Numbers

• Moranbah Water Pipeline: From Supply to Commissioning, Step by Step

• Burdekin Falls Dam to Moranbah: Continued Supply for Mining and the Local Economy

• What This Means for Other Remote Pipeline Projects

• Questions About This Project


The Problem: Drought Reaching the Mines

A Queensland drought had started to affect mining operations in the Moranbah region. Coal mining is central to the local economy, so a shortage of water was a risk to more than the mines themselves.

The Queensland Government commissioned the pipeline to move water from Burdekin Falls Dam to Moranbah and keep the region supplied.


Building the Burdekin to Moranbah Pipeline

Construction crews worked in demanding conditions. Workers constantly battled extreme heat, rugged terrain and isolation across the 218 km route.

For a pipeline of this length and in this setting, product selection matters. Viadux supplied 46 km of TYTON ductile iron pipe in DN750. Ductile iron pressure pipe for Australian water networks is manufactured to AS/NZS 2280. You can browse the range on the Viadux ductile iron pipe pages, including ductile iron water products and the SUREFLOW brand.


The Pipeline in Numbers

• Total pipeline length: 218 km

• Project value: $270 million

• Ductile iron pipe from Viadux: 46 km of TYTON DN750

• Water source: Burdekin Falls Dam

• Destination: Moranbah

• Commissioned: August 2007


Moranbah Water Pipeline: From Supply to Commissioning, Step by Step

1. Need identified: A Queensland drought began to affect mining operations in the Moranbah region.

2. Pipeline commissioned: The Queensland Government commissioned a pipeline from Burdekin Falls Dam to Moranbah.

3. Supply: Viadux supplied 46 km of TYTON DN750 ductile iron pipe, with SUREFLOW valves and fittings among the products used.

4. Construction: Crews built the 218 km line through extreme heat, rugged terrain and isolation.

5. Commissioning: The pipeline was commissioned in August 2007.

Planning a long-distance transfer main? Talk to the Viadux team about TYTON ductile iron pipe and SUREFLOW valves and fittings.


Burdekin Falls Dam to Moranbah: Continued Supply for Mining and the Local Economy

The pipeline ensured continued water supply to support coal mining and the economic stability of the surrounding region. The 218 km line links Burdekin Falls Dam to Moranbah, and Viadux's 46 km of DN750 pipe was part of it.

If you are comparing long regional pipelines, the Viadux Hamilton-Grampians Pipeline and Eyre Peninsula Pipelinecase studies show how ductile iron pipe was used in Victoria and South Australia. More civil, industrial and irrigation projects are listed on the Viadux case studies page.


What This Means for Other Remote Pipeline Projects

The Burdekin to Moranbah project is a useful reference for anyone planning a pipeline across remote country. Three practical points stand out:

• Scale: A 218 km main involves long supply chains. Pipe, valves and fittings that are specified together are easier to coordinate than parts sourced separately.

• Conditions: Extreme heat, rugged terrain and isolation affect how crews work, which makes installation planning part of the specification, not an afterthought.

• Purpose: The pipeline was built for a specific need, a reliable supply for mining operations. Starting from the use case helps set the right capacity and pipe size.

For this project, Viadux supplied 46 km of DN750 ductile iron pipe within the larger 218 km program.


Questions About This Project

What pipe did Viadux supply for the Burdekin to Moranbah pipeline?

Viadux supplied 46 km of TYTON DN750 ductile iron pipe. The project also lists 8130D MSCL pipe and SUREFLOW valves and fittings.

How long is the Burdekin to Moranbah pipeline?

The pipeline is 218 km long. It carries water from Burdekin Falls Dam to Moranbah, west of Mackay in Queensland.

Who commissioned the pipeline, and why?

The Queensland Government commissioned the pipeline, and SunWater was the client. It was built in response to a drought that had started to affect mining operations in the Moranbah region.

When was the pipeline commissioned?

The pipeline was commissioned in August 2007.


Speak with Viadux about your next transfer main
If you are specifying pipe for a long regional pipeline, the Burdekin to Moranbah project shows what ductile iron pipe can support across difficult country. Contact your nearest Viadux branch through the locations page to discuss your project.

Keywords

#Wannon Water’s Hamilton pipeline
Sign in with Email
Top4 - Made in Australia with Love
Stay In Touch